Confirm who handles each approval
Use the address check to identify the building office for this parcel. Zoning responsibility can vary by parcel.
Start with your property address to identify the offices, approvals, and project documents that apply in Town of Beaver Dam, WI.
Start with the property address. GovCodex uses it to identify the parcel, zoning authority, overlays, and the mix of municipal, county, and state approvals that can apply.
Choose a common project or enter any description on the next screen.
Issuing authority
Use the address check to identify the building office for this parcel. Zoning responsibility can vary by parcel.
Project preparation
Use the project type and property address together before choosing a form or paying a fee.
Before you file
Use the address check to confirm the current local offices, forms, and requirements before filing.
Search by project or approval. Official forms and adaptable state templates are labeled separately.
Showing forms that match your project search.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Statewide sources describe the governing code regime. Locally verified sources identify the actual issuing office, form, or adopted schedule.
These excerpts provide context from official materials associated with this municipality.
(1)Purpose. The purpose of this chapter is to promote the health, safety and welfare of the public by establishing performance minimums contained therein for design, construction, alteration, use of occupancy of buildings and parts thereof, within the City of Beaver Dam. Standards of the National Fire Protection Association (NFPA), Department of Safety and Professional Services (DSPS), and International Code Council (ICC) shall be used as guidelines in any area not covered in the chapter. Excepting immediate fire related hazards all references to buildings in this chapter shall exclude one- and two-family dwellings and their accessory buildings.(2)Application.(a)New buildings and additions. This chapter shall apply to all new buildings, structures and also to additions to existing buildings and structures.(b)General orders on existing buildings. There shall be compliance with all general orders on existing buildings.(3)Alterations. This chapter shall apply to all alterations in any building or structure which affects the structural strength, fire hazard, exits or lighting of any new or existing building or structure. This chapter does not apply to ordinary nonstructural changes or
Sec. 30-1. - General provisions · p. 1 · Open sourceExcept as otherwise provided, any person who shall violate any provision of this chapter shall be subject to a penalty as provided in section 1-9 of this Code.(Code 2001, § 11.20)
Sec. 34-1. - Penalty for violation of chapter · p. 1 · Open sourceExcept as otherwise provided in this chapter, any person who shall violate any provision of this chapter or any order, rule or regulation of the utility adopted pursuant to section 66-34, upon conviction, shall be subject to a penalty as provided in section 1-9 of this Code.(Code 2001, § 13.15)
Sec. 66-1. - Penalty for violation of chapter · p. 1 · Open sourceThe purpose of this article is to promote public health, safety and welfare and protection of property by establishing performance and minimum standards for the design, construction, alteration, use and occupancy of buildings and parts thereof and of all systems, including plumbing, heating, ventilating, air conditioning, electrical and fire protection installations.(Code 2001, § 14.01)
Sec. 14-31. - Purpose and scope of article · p. 1 · Open sourceThe City of Beaver Dam finds that the management of stormwater and other surface water discharges within and beyond the City of Beaver Dam is a matter that affects the health, safety and welfare of the city, its citizens and businesses, and others in the surrounding area. Failure to effectively manage stormwater affects the sanitary sewer utility operations of the city by, among other things, increasing infiltration to the sanitary sewer. In addition, surface water runoff causes erosion of lands, damages to businesses and residences, sedimentation, and other environmental damage in the City of Beaver Dam and/or surrounding area. In order to protect the health, safety and welfare of the public, the City of Beaver Dam is exercising its authority to establish a stormwater utility for stormwater management services. The city is acting under the authority of Wis. Stats. §§ 62.04, 62.11, 62.16, 62.175, 62.18, 66.0621, 66.0627, 66.0809, 66.0811, and 66.0821.(Ord. No. 21-2008, § I, 10-20-2008)
Sec. 67-1. - Findings and declarations of policy · p. 1 · Open sourcePrincipal building is defined as the main building or structure on a single lot or parcel of land and includes any attached garage or attached porch.Shorelands has the meaning given in Wis. Stats. § 59.692(1)(b).Shoreland setback area has the meaning given in Wis. Stats. § 59.692(1)(bn).(Ord. No. 1-2015, § I, 1-19-2015)
Sec. 60-1. - Definitions · p. 1 · Open sourceStart with the property address. The parcel determines whether municipal, county, state, shoreland, floodplain, sanitary, transportation, or special-district approvals can apply.
A building office is not listed here. Use the address check to confirm the issuing office before relying on a form.
Zoning administration may sit with the municipality or county. Confirm the parcel authority before relying on statewide guidance.
No. Adopted fees, application versions, issuing offices, and required attachments can change. Verify the current official source before filing or paying a fee.
