Confirm who handles each approval
Use the address check to identify the building office for this parcel. City of DeKalb publishes the official zoning map GovCodex reads a property's district from.
Start with your property address to identify the offices, approvals, and project documents that apply in City of DeKalb, IL.
Start with the property address. GovCodex uses it to identify the parcel, zoning authority, overlays, and the mix of municipal, county, and state approvals that can apply.
Choose a common project or enter any description on the next screen.
Issuing authority
Use the address check to identify the building office for this parcel. City of DeKalb publishes the official zoning map GovCodex reads a property's district from.
Project preparation
Use the project type and property address together before choosing a form or paying a fee.
Before you file
Use the address check to confirm the current local offices, forms, and requirements before filing.
These project checks highlight situations that can add an approval. Your property address and project scope determine what applies.
Detached Garage - Shed Permit is required for a garage.
Detached Garage - Shed Permit is required for a shed over 120 sq ft.
Deck, Gazebo, Pergola Permit is required for a deck.
New/Alteration Permit (plan review required) is required for a addition.
Fence Permit is required for a fence 3 ft or taller.
Swimming Pool - Hot Tub Permit is required for a pool. A pool barrier is required.
New/Alteration Permit (plan review required) is required for a home.
Use this sequence to organize the work. The property address and project scope determine which steps actually apply.
Detached Garage - Shed Permit is required for a garage.
Detached Garage - Shed Permit is required for a shed over 120 sq ft.
Deck, Gazebo, Pergola Permit is required for a deck.
New/Alteration Permit (plan review required) is required for a addition.
Fence Permit is required for a fence 3 ft or taller.
Swimming Pool - Hot Tub Permit is required for a pool. A pool barrier is required.
New/Alteration Permit (plan review required) is required for a home.
Separate offices can review different parts of the same project. Confirm the parcel-specific split before filing.
New home: permit required
Search by project or approval. Official forms and adaptable state templates are labeled separately.
Showing forms that match your project search.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Use this as a preparation checklist, then confirm the current local filing form.
Statewide sources describe the governing code regime. Locally verified sources identify the actual issuing office, form, or adopted schedule.
These excerpts provide context from official materials associated with this municipality.
CITY OF DEKALB MUNICIPAL CODE CHAPTER 23 UNIFIED DEVELOPMENT ORDINANCE ARTICLE 1: TITLE, PURPOSE AND EFFECTIVE DATE 1.01 Title 1.02 Purpose and Intent 1.03 Effective Date ARTICLE 2: GENERAL PROVISIONS 2.01 Authority 2.02 Jurisdiction 2.03 Relationship to the Comprehensive Plan and Other Planning Documents 2.04 Rules of Interpretation 2.05 Computation of Time 2.06 Severability ARTICLE 3: DEFINITIONS 3.01 Definitions ARTICLE 4: ZONING DISTRICTS AND OFFICIAL ZONING MAP 4.01 Establishment of Zoning Districts 4.02 Establishment of Overlay Districts 4.03 Official Zoning Map 4.04 Zoning District Boundaries 4.05 Zoning of Annexed Area ARTICLE 5: ZONING DISTRICT REGULATIONS 5.01 “SFR-1” Single Family Residential District 5.02 “SFR-2” Single Family Residential District 5.03 “TFR” Two Family Residential District 5.04 “MFR-1” Low Density Small Scale Multiple Family Residential 5.05 “MFR-2” High Density, High Bulk Multiple Family Residential District 5.06 “NC” Neighborhood Commercial District 5.07 “LC” Light Commercial District 5.08 “G
Official reference excerpt · p. 1 · Open sourceSec. 53-A TITLE
Sec. 53-A · p. 1 · Open sourceSection 14-A BUILDING PERMITS Replace Sec. 14-A-2 to read as follows:
Sec. 14-A · p. 1 · Open sourceSTATE OF ILLINOIS ) )SS COUNTY OF DEKALB ) ORDINANCE 2024-11 AN ORDINANCE AMENDING CHAPTER 14 OF THE DEKALB COUNTY CODE REGARDING ADOPTED BUILDING CODES WHEREAS, Chapter 14 of the DeKalb County Code adopts building and construction codes containing regulations and standards for construction of buildings and structures in DeKalb County; and WHEREAS, the improvement in building and construction industry standards and technological advancements over time make it necessary and expedient that the County update its adopted building codes in order to continue to adequately protect the public health, safety and welfare; and WHEREAS, the building codes adopted by the County were last updated in 2019; and WHEREAS, the Planning, Zoning and Development Committee of the DeKalb County Board has considered updated building codes recommended for adoption by the County Building Development Official, and has recommended that the updated bui
Official reference excerpt · p. 1 · Open sourceSec. 14-A-2 Building Permit Fees Any person desiring a building permit as required shall pay a fee according to the following schedule: 1. Residential (one- and two-family) principal structures: a. New: i Floor area per square foot .... $0.60 ii. Electrical .... 150.00 iii. Plumbing .... 150.00 iv. Mechanical .... 150.00 1
Sec. 14-A-2 · p. 1 · Open sourceCHAPTER 24 “BUILDING CODE” LATEST REVISION: December 9, 2024 (Ordinance 2024-063) SECTIONS: 24.01 ADOPTION: INTERNATIONAL BUILDING CODE / 2021 24.01-01 AMENDMENTS 24.02 PLAN REVIEW AND SUPPLEMENTAL PERMIT FEES ARTICLE 0: CONTRACTOR REQUIREMENTS. Section 0.01 Registration of Construction Managers and General Electrical and Mechanical Contractors Section 0.02 State of Illinois Department of Public Health Licensed Plumbing Contractors Section 0.03 State of Illinois Licensed Roofing Contractors Section 0.04 State of Illinois Licensed Private Alarm Contactors Section 0.05 State of Illinois Licensed Fire Sprinkler Contractor ARTICLE 1: INTERNATIONAL BUILDING CODE ARTICLE 2: INTERNATIONAL RESIDENTIAL CODE FOR ONE-AND TWO-FAMILY DWELLINGS ARTICLE 3: INTERNATIONAL FIRE CODE ARTICLE 4: INTERNATIONAL MECHANICAL CODE ARTICLE 5: INTERNATIONAL FUEL GAS CODE ARTICLE 6: INTERNATIONAL SWIMMING POOL AND SPA CODE ARTICLE 7: INTERNATIONAL EXISTING BUILDING CODE ARTICLE 8: NATIONAL ELECTRICAL CODE ARTICLE 9: STATE OF ILLINOIS PLUMBING CODE ARTICLE 10: INTERNATIONAL PROPERTY
Official reference excerpt · p. 1 · Open sourceStart with the property address. The parcel determines whether municipal, county, state, shoreland, floodplain, sanitary, transportation, or special-district approvals can apply.
A building office is not listed here. Use the address check to confirm the issuing office before relying on a form.
City of DeKalb administers zoning and publishes its official zoning map; GovCodex reads a property's zoning district from it for an address check.
No. Adopted fees, application versions, issuing offices, and required attachments can change. Verify the current official source before filing or paying a fee.
