Confirm who handles each approval
Official building guidance points to Building Permit Application. Zoning responsibility can vary by parcel.
Start with your property address to identify the offices, approvals, and project documents that apply in City of Naperville, IL.
Start with the property address. GovCodex uses it to identify the parcel, zoning authority, overlays, and the mix of municipal, county, and state approvals that can apply.
Choose a common project or enter any description on the next screen.
Issuing authority
Official building guidance points to Building Permit Application. Zoning responsibility can vary by parcel.
Project preparation
Use the project type and property address together before choosing a form or paying a fee.
Before you file
Use the address check to confirm the current local offices, forms, and requirements before filing.
These project checks highlight situations that can add an approval. Your property address and project scope determine what applies.
Naperville is home-rule and runs its own zoning review through TED. A Title 6 zoning review — confirming the district setbacks, height, lot coverage and use — is performed as part of the plan review (Building + Zoning +…
A fence permit is required to install or replace a fence. The finished side must face away from the applicant's property and a plat of survey with the fence drawn on it is required. Zoning heights (§ 6-2-12): <=3 ft forw…
A building permit is required to construct any elevated deck (no size threshold) or to replace structural/safety members (beams, joists, stairs, railings). Zoning: decks/patios/porches may extend 5 ft into a required fro…
Detached accessory buildings are governed by § 6-2-10: not within 5 ft of any rear or interior side lot line, no nearer a street lot line than the principal building's nearest wall, meeting the district front and corner-…
A building permit is required to construct a detached garage. Zoning: § 6-2-10 accessory placement (>=5 ft off rear/interior side lot lines) plus the detached-garage rear-yard coverage credit / 25% rear-yard cap interpla…
A building permit is required for room additions and alterations. Zoning: the district yard/height standards (§ 6-6) plus the teardown/infill standards of § 6-2-26 (2.5 stories / 35 ft; roof peak <=40 ft; max building co…
A building permit is required to finish a basement (schedule row "building additions, remodeling, finished basement"). No zoning setback trigger (interior work). Electrical and plumbing trade sub-permits as scope require…
Naperville has NO general accessory-dwelling-unit / coach-house allowance. The only second-unit provision is the Residential Care Unit (§ 6-2-34) — a conditional use for a qualifying developmentally-disabled family membe…
Register and apply in the City of Naperville Permitting, Plans and Licensing portal (napervilleil-energovweb.tylerhost.net/apps/SelfService); upload PDFs per the electronic-submittal requirements; pay the admin/clerical…
Required for building/zoning permits. For fences, decks, pools and additions the improvement must be drawn on the plat of survey.
Construction plans/drawings for the proposed work, compliant with the electronic-submittal format (electronic-submittal-requirements-for-building-permits PDF).
After submittal the TED Business Group performs Building, Zoning and Engineering review; comments or approval issue, then final fees are paid and the permit is printed.
Request a JULIE 811 locate at least 48 hours before any digging (foundations, fence posts, pools).
Required inspections are listed in the portal; schedule all inspections at least 72 hours in advance (inspection line closed 1-2 p.m.). No fixed per-family inspection list is published.
Use this sequence to organize the work. The property address and project scope determine which steps actually apply.
Naperville is home-rule and runs its own zoning review through TED. A Title 6 zoning review — confirming the district setbacks, height, lot coverage and use — is performed as part of the plan review (Building + Zoning +…
A fence permit is required to install or replace a fence. The finished side must face away from the applicant's property and a plat of survey with the fence drawn on it is required. Zoning heights (§ 6-2-12): <=3 ft forw…
A building permit is required to construct any elevated deck (no size threshold) or to replace structural/safety members (beams, joists, stairs, railings). Zoning: decks/patios/porches may extend 5 ft into a required fro…
Detached accessory buildings are governed by § 6-2-10: not within 5 ft of any rear or interior side lot line, no nearer a street lot line than the principal building's nearest wall, meeting the district front and corner-…
A building permit is required to construct a detached garage. Zoning: § 6-2-10 accessory placement (>=5 ft off rear/interior side lot lines) plus the detached-garage rear-yard coverage credit / 25% rear-yard cap interpla…
A building permit is required for room additions and alterations. Zoning: the district yard/height standards (§ 6-6) plus the teardown/infill standards of § 6-2-26 (2.5 stories / 35 ft; roof peak <=40 ft; max building co…
A building permit is required to finish a basement (schedule row "building additions, remodeling, finished basement"). No zoning setback trigger (interior work). Electrical and plumbing trade sub-permits as scope require…
Naperville has NO general accessory-dwelling-unit / coach-house allowance. The only second-unit provision is the Residential Care Unit (§ 6-2-34) — a conditional use for a qualifying developmentally-disabled family membe…
Register and apply in the City of Naperville Permitting, Plans and Licensing portal (napervilleil-energovweb.tylerhost.net/apps/SelfService); upload PDFs per the electronic-submittal requirements; pay the admin/clerical…
Required for building/zoning permits. For fences, decks, pools and additions the improvement must be drawn on the plat of survey.
Separate offices can review different parts of the same project. Confirm the parcel-specific split before filing.
Conditional Use Permit (Residential Care Unit)
Use these to anticipate cost structure. Confirm the adopted schedule and project calculation before filing.
Base fee $88 · minimum $88 · Flat $88 = $18 clerical + $26 permit + $44 x1 inspection ("Fence ($88)"). Fee dated 2019 (Ord 18-145) — verify no newer residential schedule before quoting live.
View fee sourceNaperville prices building work as flat structure-type fees (deck $132, patio $88/$132, gazebo $132, solar $132, pool $88/$132 — recorded on the permit_triggers rows) or, for additions/garages/basements, a variable $18 clerical + $25/plan page + $50/inspection…
View fee sourceSearch by project or approval. Official forms and adaptable state templates are labeled separately.
Showing forms that match your project search.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Statewide sources describe the governing code regime. Locally verified sources identify the actual issuing office, form, or adopted schedule.
City of Naperville, IL · checked July 20, 2026
City of Naperville, IL · checked July 20, 2026
City of Naperville, IL · checked July 20, 2026
City of Naperville, IL · checked July 20, 2026
Start with the property address. The parcel determines whether municipal, county, state, shoreland, floodplain, sanitary, transportation, or special-district approvals can apply.
Building Permit Application. Confirm the current filing process at the official source before submitting.
Zoning administration may sit with the municipality or county. Confirm the parcel authority before relying on statewide guidance.
No. Adopted fees, application versions, issuing offices, and required attachments can change. Verify the current official source before filing or paying a fee.