Confirm who handles each approval
Use the address check to identify the building office for this parcel. Zoning responsibility can vary by parcel.
Start with your property address to identify the offices, approvals, and project documents that apply in City of Joliet, IL.
Start with the property address. GovCodex uses it to identify the parcel, zoning authority, overlays, and the mix of municipal, county, and state approvals that can apply.
Choose a common project or enter any description on the next screen.
Issuing authority
Use the address check to identify the building office for this parcel. Zoning responsibility can vary by parcel.
Project preparation
Use the project type and property address together before choosing a form or paying a fee.
Before you file
Use the address check to confirm the current local offices, forms, and requirements before filing.
These project checks highlight situations that can add an approval. Your property address and project scope determine what applies.
A shed permit is required. Prohibited in front yards; >= 3 ft side/rear (no easements); >= 6 ft from the house unless attached; <= 15 ft high; roofed structures <= 30 percent of the lot; anchored at >= 4 points; a shed >…
Joliet is home-rule; no county building department governs incorporated Joliet. A zoning review confirming district use and yards is performed at plan review. The per-district dimensional standards (lot area, lot width,…
A fence permit is required. Max 4 ft in a front yard, 6 ft in a side/rear yard (visibility); anything > 6 ft anywhere requires ZBA review/approval; not in a detention/floodplain/floodway easement; posts kept off the prop…
A building permit is required (Municode sec. 8-34: unlawful to construct/enlarge/alter/demolish a structure without a permit). An unroofed deck must be >= 3 ft from the property line (no easements); a roofed deck follows…
A permit is required prior to constructing a detached garage; >= 3 ft from the property line (no easements); out of all easements; HOA approval if applicable.
A "Home Additions" permit is required (alter/enlarge per sec. 8-34). The addition must meet principal-structure setbacks (see the per-district side-yard table on the deck row; front/rear = explicit_unknown, unpublished Z…
No dedicated city page. Covered by sec. 8-34 ("alter ... a structure") -> a building permit (New Home/Remodel), plus trade permits (electrical/plumbing/HVAC) as applicable. Threshold specifics = needs confirmation.
ADUs / dwelling-unit conversions are not addressed on any City permit page and are governed by the unpublished Zoning Ordinance use/density rules. Whether a second unit is permitted is unconfirmed.
Complete the applicable form and email it to permitapplication@joliet.gov (residential). Commercial: email eplansadmin@joliet.gov -> a ProjectDox (Avolve) invite from DoNotReplyJOLIP@avolvesoftware.com to upload plans. N…
All contractors must have current registration on file before a permit issues; if a contractor does the work, the contractor (not the owner) pulls the permit (Municode sec. 8-36; owner may pull only for own work).
A marked plat of survey is required. Include measurements (L x W).
Structural drawings/plans, >= 2 copies, drawn to scale (Municode sec. 8-38); a cost estimate (labor + material); a contract copy if a contractor is used.
A Residential Accessory Structures Review Form is required for accessory projects (sheds, garages, decks, etc.).
Request a JULIE 811 (800-892-0123) locate before digging. HOA approval if applicable.
Use this sequence to organize the work. The property address and project scope determine which steps actually apply.
A shed permit is required. Prohibited in front yards; >= 3 ft side/rear (no easements); >= 6 ft from the house unless attached; <= 15 ft high; roofed structures <= 30 percent of the lot; anchored at >= 4 points; a shed >…
Joliet is home-rule; no county building department governs incorporated Joliet. A zoning review confirming district use and yards is performed at plan review. The per-district dimensional standards (lot area, lot width,…
A fence permit is required. Max 4 ft in a front yard, 6 ft in a side/rear yard (visibility); anything > 6 ft anywhere requires ZBA review/approval; not in a detention/floodplain/floodway easement; posts kept off the prop…
A building permit is required (Municode sec. 8-34: unlawful to construct/enlarge/alter/demolish a structure without a permit). An unroofed deck must be >= 3 ft from the property line (no easements); a roofed deck follows…
A permit is required prior to constructing a detached garage; >= 3 ft from the property line (no easements); out of all easements; HOA approval if applicable.
A "Home Additions" permit is required (alter/enlarge per sec. 8-34). The addition must meet principal-structure setbacks (see the per-district side-yard table on the deck row; front/rear = explicit_unknown, unpublished Z…
No dedicated city page. Covered by sec. 8-34 ("alter ... a structure") -> a building permit (New Home/Remodel), plus trade permits (electrical/plumbing/HVAC) as applicable. Threshold specifics = needs confirmation.
ADUs / dwelling-unit conversions are not addressed on any City permit page and are governed by the unpublished Zoning Ordinance use/density rules. Whether a second unit is permitted is unconfirmed.
Complete the applicable form and email it to permitapplication@joliet.gov (residential). Commercial: email eplansadmin@joliet.gov -> a ProjectDox (Avolve) invite from DoNotReplyJOLIP@avolvesoftware.com to upload plans. N…
All contractors must have current registration on file before a permit issues; if a contractor does the work, the contractor (not the owner) pulls the permit (Municode sec. 8-36; owner may pull only for own work).
Separate offices can review different parts of the same project. Confirm the parcel-specific split before filing.
Conditional Zoning Review (ADU / Conversion)
Use these to anticipate cost structure. Confirm the adopted schedule and project calculation before filing.
Base fee $65 · minimum $65 · Flat $65 (the one unambiguous published Joliet flat fee). CURRENCY CAVEAT: the schedule is dated 2020 and states fees are liable to change; verify the current amount before relying on it. Municode sec. 8-95 = triple fee for unpermi…
View fee sourceThe residential permit families (Decks / Home Additions / Sheds / Patios / Pergolas-Gazebos) are each a flat $65 on the 2020 fee page, but the schedule is stale and states amounts are liable to change, so building-permit is left needs_review (never present $0)…
View fee sourceSearch by project or approval. Official forms and adaptable state templates are labeled separately.
Showing forms that match your project search.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Statewide sources describe the governing code regime. Locally verified sources identify the actual issuing office, form, or adopted schedule.
City of Joliet, IL · checked July 20, 2026
City of Joliet, IL · checked July 20, 2026
City of Joliet, IL · checked July 20, 2026
City of Joliet, IL · checked July 20, 2026
Start with the property address. The parcel determines whether municipal, county, state, shoreland, floodplain, sanitary, transportation, or special-district approvals can apply.
A building office is not listed here. Use the address check to confirm the issuing office before relying on a form.
Zoning administration may sit with the municipality or county. Confirm the parcel authority before relying on statewide guidance.
No. Adopted fees, application versions, issuing offices, and required attachments can change. Verify the current official source before filing or paying a fee.