Confirm who handles each approval
Official building guidance points to Building Permit Application. Zoning responsibility can vary by parcel.
Start with your property address to identify the offices, approvals, and project documents that apply in City of Aurora, IL.
Start with the property address. GovCodex uses it to identify the parcel, zoning authority, overlays, and the mix of municipal, county, and state approvals that can apply.
Choose a common project or enter any description on the next screen.
Issuing authority
Official building guidance points to Building Permit Application. Zoning responsibility can vary by parcel.
Project preparation
Use the project type and property address together before choosing a form or paying a fee.
Before you file
Use the address check to confirm the current local offices, forms, and requirements before filing.
These project checks highlight situations that can add an approval. Your property address and project scope determine what applies.
Aurora is home-rule and administers its own zoning citywide across all four counties (Kane, DuPage, Will, Kendall). A Chapter 49 (Ord. 3100) zoning review — confirming the district, yard setbacks, height, coverage and us…
A fence permit is required prior to install, reconstruction, enlargement, or structural alteration of any fence. Residential heights generally 3 ft in restricted areas up to 6 ft elsewhere; front yard fence must be > 50…
A building permit is required for any deck attached to the home OR >= 30 in above grade (treated as an accessory structure). Guardrails required where > 30 in above grade (>= 36 in high); footing inspection at 42 in dept…
A storage shed is permitted as an accessory structure (third-party threshold "> 70 sq ft" — CONFIRM against Chapter 49 / the building code). Accessory-structure setbacks: min 5 ft side/rear, none in the front yard, extra…
A dedicated "New Garage" permit is required to construct a detached garage. Garage valuation = $31.50 per sq ft. Accessory-structure setbacks apply (min 5 ft side/rear, none in the front yard, corner-lot extra).
A building permit is required for any addition. The addition follows the R-district setbacks (explicit_unknown per Chapter 49). Extra fees are due: Engineering, Fire Impact, Land Cash/School & Park, Sewer Connection + Fo…
A "Single Family Residential Remodel" permit is required to finish a basement; priced as Residential Remodeling (multi-trade) or 1-trade. Unfinished-basement valuation = $31.50 per sq ft. Interior work — no zoning setbac…
Aurora IL has NO dedicated ADU / coach-house permit or program in evidence. Two-family use is by district (R-4 / R-4A two-family; R-5 / R-5A multiple-family); a conversion to two units is only lawful in a two-family/mult…
A permit will not issue until the contractor is registered/licensed. Requires a Certificate of Insurance naming Aurora primary/non-contributory additional insured ($1,000,000 general aggregate / $500,000 per occurrence;…
Apply online at auro-trk.aspgov.com/etrakit (or in person at 77 S. Broadway); an optional pre-review meeting is available; pay the Application Fee at submittal. Schedule inspections via eTRAKiT or (630) 256-3130.
A plat of survey / site plan showing property lines, existing structures and setbacks is required for building/zoning permits.
Dimensioned construction drawings (for decks: footing/post/beam/joist, ledger flashing + bolts, railing/guardrail >= 36 in) plus manufacturer cut sheets. Commercial/engineered plans need a licensed design professional st…
Request a JULIE 811 (800-892-0123) locate >= 48 hours before any digging (foundations, fence posts, pools).
Where applicable: county Health Department (Kane/DuPage/Will/Kendall) for septic; Fox Metro for sewer/grease trap; Kane County highway impact tax. A "PDD" resolves to the site-specific PD ordinance; an "OUT" parcel is co…
Use this sequence to organize the work. The property address and project scope determine which steps actually apply.
Aurora is home-rule and administers its own zoning citywide across all four counties (Kane, DuPage, Will, Kendall). A Chapter 49 (Ord. 3100) zoning review — confirming the district, yard setbacks, height, coverage and us…
A fence permit is required prior to install, reconstruction, enlargement, or structural alteration of any fence. Residential heights generally 3 ft in restricted areas up to 6 ft elsewhere; front yard fence must be > 50…
A building permit is required for any deck attached to the home OR >= 30 in above grade (treated as an accessory structure). Guardrails required where > 30 in above grade (>= 36 in high); footing inspection at 42 in dept…
A storage shed is permitted as an accessory structure (third-party threshold "> 70 sq ft" — CONFIRM against Chapter 49 / the building code). Accessory-structure setbacks: min 5 ft side/rear, none in the front yard, extra…
A dedicated "New Garage" permit is required to construct a detached garage. Garage valuation = $31.50 per sq ft. Accessory-structure setbacks apply (min 5 ft side/rear, none in the front yard, corner-lot extra).
A building permit is required for any addition. The addition follows the R-district setbacks (explicit_unknown per Chapter 49). Extra fees are due: Engineering, Fire Impact, Land Cash/School & Park, Sewer Connection + Fo…
A "Single Family Residential Remodel" permit is required to finish a basement; priced as Residential Remodeling (multi-trade) or 1-trade. Unfinished-basement valuation = $31.50 per sq ft. Interior work — no zoning setbac…
Aurora IL has NO dedicated ADU / coach-house permit or program in evidence. Two-family use is by district (R-4 / R-4A two-family; R-5 / R-5A multiple-family); a conversion to two units is only lawful in a two-family/mult…
A permit will not issue until the contractor is registered/licensed. Requires a Certificate of Insurance naming Aurora primary/non-contributory additional insured ($1,000,000 general aggregate / $500,000 per occurrence;…
Apply online at auro-trk.aspgov.com/etrakit (or in person at 77 S. Broadway); an optional pre-review meeting is available; pay the Application Fee at submittal. Schedule inspections via eTRAKiT or (630) 256-3130.
Separate offices can review different parts of the same project. Confirm the parcel-specific split before filing.
Conditional Zoning Review (ADU / Two-Family Conversion)
Use these to anticipate cost structure. Confirm the adopted schedule and project calculation before filing.
Base fee $31 · minimum $31 · Flat $31 (RESIDENTIAL FENCE). The paired "$82" secondary value in the flattened PDF table is ambiguous -> needs_review; not encoded here. Effective for permits applied after Jan 01, 2026.
View fee sourceBase fee $155 · minimum $155 · PIF min $155 (valuation x 2.08 percent; garage valuation $31.50/sq ft) + $77 app + $84 PRF + $23 Certificate. Seeded as the minimum published amount; the valuation-driven PIF may exceed it for larger garages.
View fee sourceBase fee $217 · minimum $217 · Seeded as Pool Below Ground PIF $217. Pool Above Ground PIF = $186 (choose in-ground here; above-ground noted). Both add $77 app + $112 PRF + $23 Cert. Temporary/seasonal pool = flat $31. Barrier/fence inspection is a mandatory g…
View fee sourceAurora prices building work as valuation-formula amounts that DIFFER by structure type (Deck/Gazebo PIF $93; Residential New/Addition PIF min $1,817; Remodeling 2/3/4-trade $164/$246/$328 — recorded on the deck/addition/basement permit_triggers). The flat sche…
View fee sourceSearch by project or approval. Official forms and adaptable state templates are labeled separately.
Showing forms that match your project search.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Use this official form when preparing your project submission.
Statewide sources describe the governing code regime. Locally verified sources identify the actual issuing office, form, or adopted schedule.
Start with the property address. The parcel determines whether municipal, county, state, shoreland, floodplain, sanitary, transportation, or special-district approvals can apply.
Building Permit Application. Confirm the current filing process at the official source before submitting.
Zoning administration may sit with the municipality or county. Confirm the parcel authority before relying on statewide guidance.
No. Adopted fees, application versions, issuing offices, and required attachments can change. Verify the current official source before filing or paying a fee.